Most homeowners think a remodeling project starts the day demolition begins. But more often than not, the direction of a project is already set long before that.
For this project, we took an old, run-down garage and transformed it into a sleek, modern architecture office. We reframed, sound proofed and did voluntary seismic work for the structure. New doors were installed and an engineered steel and glass awning was placed over the double doors.
This back and side yard landscape project incorporated many facets of construction and provided a significant grade challenge in that the backyard was significantly higher than the house foundation. It required demolition of an old garage, tree removal and large amounts of dirt removal.