A whole home, reconnected
Back for a third time, and the biggest yet
This is the third major project these clients have hired us for over the past 14 years. For this project, we completely gutted the entire front two-thirds of their house, which includes a foyer, living room, dining room, kitchen, hallway, and first floor bathroom. We also installed new stairs to a new basement, which will be a future fourth large project we will do for them.
When we had everything demolished, we discovered that the ceiling and roof framing was way under framed, so we had to install all new ceiling joists, posts and beams, and other framing before we could even start with the remodel we intended. We ran all new electrical on the entire floor, all new plumbing to the kitchen and bathroom, and new mechanical for the new stove hood and bath fan. We even installed a bath fan on the lower wall in the bathroom where the cat litter box sits to get rid of the smell efficiently.
We reframed for the foyer, living room, dining room, and kitchen so the flow between the four rooms was improved. We installed many custom cabinets in the kitchen, the entertainment center in the living room, and for storage in the foyer. We installed new finishes throughout and the only feature that remained, and we improved this significantly, is the dining room built in.